Industrial capability
Industrial Strainers
Basket, Y and temporary strainers made to specified line sizes and service conditions.

Standard work procedure
Project-specific code, client specification and approved inspection plan take precedence.
Data-sheet reviewFluid, pressure, temperature, mesh and allowable pressure drop are confirmed.
Material verificationBody, screen and connection materials are checked.
FabricationCutting, forming, machining and fit-up follow approved drawings.
Welding & inspectionQualified welding and specified NDE are completed.
Pressure & functional testLeak tightness, screen fit and flow orientation are verified.
PreservationInternal cleanliness, coating and shipping protection are applied.
Applicable standards
Quality & safety controls
Material traceability, approved drawings, qualified personnel, calibrated inspection equipment, documented hold points and final turnover records are applied to the contract scope.
